Sunday, March 13, 2011

pinup order, all review

I have organized the pinup order by categorizing and grouping the projects per the following headings: Site (urban) division or statement-Program idea-Architectural type (for Sports-Pool)/ Passive idea

Paired-Fitness-Carved Landscape/shafts or voids
1. Kevin
Paired Line- Fitness and Wellness/Interior Courtyard
2. Josh
3. Thirds-Stacked and Hanging-Canopy/cross ventilation through skins
Gregory
4.5.6. Thirds-Stacked-Depth in Container or perimeter/ cross ventilation through Courtyards
Jamie
Robert
Jesse
7. Whole-Stepped-Landscape/Solar and Air Skylights
Oozy
8. Paired w/ insert-Landscape/ brow openings (consider eye brow openings in main roof)
Eric
9. Thirds-layered and crossing-building/cross ventilation through skylights
Sal
10. ?
Lewis
11. 12. 13.Vertical courtyard/atrium…
Nick
Tariq
Giuseppe
14. 15.Vertical Assembly- Tanks-…
Melissa
Dominic
16. Horizontal Assembly…
Nathan

I got towards the end and did not fully complete the heading lines but feel that this description will assist all of us in completing the project and finding the Architecture especially with these action words. The actions words assist the form and movement.

No comments:

Post a Comment