Wednesday, April 27, 2011

final requirements

Per yesterdays hand out:

Diagrams 1/32” with associated plans and sections as required
  1. base
  2. volumetric
  3. program
  4. circulation- code egress diagram and movement form
  5. event
  6. structure
  7. skin
  8. unfolded skin with roof as solid/void
  9. unfolded skin with material joints and material key using bit map of material
  • site plan: include water front promenade

  • Physical models:
1. 1/32” concept,
2. 3/32” whole or 1/16” if 3d model is provided with walk thru views of major project spaces
3. 1/16” structure
4. Structural Bay system: ¼”

  • All Plans, elevations with shadows, and sections all at 1/16”
  • Major plan at 1/8”
  • 2 sections at 1/8”
  • 1 elevation at 1/8”
  • Wall section ¼”

Passive and active climate analysis and section.

No comments:

Post a Comment